Client Notice

Pricing update from October 2026: Revised pricing will apply due to continued increases in material, manufacturing and logistics costs.
New Built Project

Epsilon

Magtech General Construction & Trading Pte Ltd successfully completed the supply and installation of four (4) units of Fibreglass Reinforced Plastic (FRP/GRP) water tanks for Project Epsilon in Singapore.

These tanks are designed for make-up water usage in a new-built development, ensuring a reliable and durable water storage solution for long-term operation.

FRP/GRP water tank installation for Project Epsilon, Singapore – completed sectional tank
completed sectional tank

PROJECT INFORMATION

PROJECT OVERVIEW

Each FRP tank is sized at 5m (L) x 4m (W) x 2m (H), providing optimal storage capacity while maintaining structural efficiency. The tanks are constructed using high-quality fibreglass panels, offering excellent resistance against corrosion, UV exposure, and Singapore’s harsh weather conditions, making them ideal for rooftop and outdoor installations.

FRP (also commonly referred to as GRP) water tanks are widely used in Singapore due to their lightweight structure, ease of installation, and compliance with local standards such as SS245. These tanks are especially suitable for make-up water systems, where consistent water supply and hygiene are critical for building operations.

Our scope of work included the full installation of sectional panel tanks, including assembly of base, side panels, roof structure, internal reinforcements, and all necessary accessories. The installation was carried out by our experienced team in accordance with safety requirements and industry best practices.

With over 35 years of experience and more than 4,000 tanks installed across Asia, Magtech continues to deliver reliable FRP water tank solutions for new builds, replacements, and repair works in Singapore.

35+

Years of experience

in sectional water tanks

4,000+

Tanks installed

across Singapore and Asia

Our team will respond within 24–48 hours.

NEED A FASTER RESPONSE? WhatsApp Our Team
PROJECT GALLERY

New Built Photos

DISCUSS YOUR PROJECT

Enquire About Epsilon Tank Installation, Replacement or repair

Send us the required effective capacity, available space, intended water use and project drawings. Our team can review the information and advise on the next step.

Our team will respond within 24–48 hours.

NEED A FASTER RESPONSE? WhatsApp Our Team

Other related projects

Project: Royal Plaza Hotel

Project: 35 Pioneer Sector

Project: Koh Norea Tower 1