Quartz Industrial Building

Project: Quartz Industrial Building FRP Water Tank Repair

Broken balancing flange - FRP Water Tank Repair at Quartz Industrial Feat

Overview

This project involved an urgent FRP water tank repair in Singapore at Quartz Industrial Building, where a broken balancing flange and an active leakage point required immediate attention.

As the building was in active industrial use, water disruption during working hours was not permitted, making both timing and execution critical.

 

Scope of Work

  • Replacement of damaged balancing flange
  • Rectification of leakage point
  • Sourcing of compatible flange for discontinued tank brand
  • Night/evening repair works to avoid operational disruption
  • Testing and reinstatement of tank system

 

Our Approach (Process)

1. Site Assessment & Problem Identification

Our team conducted an on-site inspection and to quickly identify the technical details for rectification works to proceed

2. Specialised Sourcing for Sekisui Tank System

The existing tank was from Sekisui, a discontinued brand with non-standard flange specifications compared to modern FRP tank systems.

Through our strong industry network, we were able to source compatible flanges quickly, avoiding delays and the need for costly modifications.

3. Strategic Work Planning (Zero Downtime Requirement)

As water shutdown during working hours was not allowed, our team scheduled the works during evening hours, ensuring no disruption to the client’s operations.

4. Repair & Replacement Works

The defective flange was replaced and leakage rectified by our experienced team, ensuring proper sealing, alignment, and system integrity.

5. Testing & Reinstatement

Upon completion, the system was checked and restored for immediate use, ensuring the tank was operational and functioning reliably.

Due to the late-night working conditions, a minor leakage point was not visible during the initial completion. Upon notification from the client the following day, our team responded promptly and carried out the necessary rectification works to resolve the issue quickly, ensuring the system was fully leak-free thereafter.

Project Outcome

  • Completed within a few hours
  • Zero disruption to building operations
  • Successful sourcing of rare/discontinued components
  • Immediate restoration of tank functionality
  • Prevention of further leakage issues

 

Why This Matters

Repairing older or discontinued tank systems can be challenging due to non-standard components and limited availability of spare parts.

With over 35 years of experience in FRP water tank repair and replacement in Singapore, our team is able to:

  • Handle legacy and discontinued tank brands
  • Source hard-to-find components quickly
  • Execute urgent repairs with minimal downtime

This ensures clients receive practical, cost-effective solutions while maintaining operational continuity.

Project Info

Get a Free Water Tank Consultation

Our team will get back to you within 24-48 hours

Other related projects

Project: Olympia City

Project: Norodom Business Centre

Project: Margaret Villa