Replacement Project

2 Second Chin Bee Road

Magtech General Construction & Trading Pte Ltd replaced the make-up water tank at a factory at 2 Second Chin Bee Road, Singapore, together with the associated piping works.

FRP water tank replacement at 2 Second Chin Bee Road Singapore - completed tank alongside the factory
Completed tank alongside the factory

PROJECT INFORMATION

PROJECT OVERVIEW

The client asked us to replace the existing tank in full. When we looked at how the tank was actually being used, it was clear that the existing one was considerably larger than the factory needed. Rather than replace it like for like, we proposed a smaller tank sized to the site’s real demand.

The existing tank measured (2+2)m x 4m x 2m (H). The replacement measures (2+2)m x 2m x 2m (H) – the same length and height, with the width halved. The factory keeps the storage it actually uses and stops carrying the volume it never did.

Downsizing a tank brings a practical problem with it: the new tank still has to land on the reinforced concrete plinth that was built for the old one. We planned the replacement around that from the start, and the new tank was installed on the existing plinth complete with a skid base, so no new concrete work was needed.

Because this is a working factory, we installed a temporary bypass before the changeover so that water remained available while the old tank was dismantled and the new one built. The scope also covered new ball float valves and gate valves, alteration and reconnection of the pipework, internal cleaning and flushing of the new tank, and a water sample test at a SINGLAS accredited laboratory in line with PUB requirements.

01
Scope of work
  • Assessment of the existing tank against the factory’s actual water usage
  • Sizing of the replacement tank to suit both the usage and the existing RC plinth
  • Temporary bypass to maintain water supply during the works
  • Dismantling, shifting and disposal of the existing water tank
  • Supply, delivery and installation of a new FRP sectional water tank complete with skid base
  • Supply and replacement of two 3-inch ball float valves and four gate valves
  • Piping alteration and reconnection works
  • Replacement of two outlet gate valves
  • Internal cleaning, washing and flushing of the tank to remove sludge, scale and sediment
  • Water sample test at a SINGLAS accredited laboratory in line with PUB requirements
  • General cleaning on completion
02
Project outcome
  • Oversized make-up water tank replaced with one matched to the factory’s actual usage
  • Tank footprint halved, from (2+2)m x 4m to (2+2)m x 2m, at the same 2m height
  • New tank installed on the existing RC plinth with no new concrete work
  • Water supply maintained throughout via a temporary bypass
  • New ball float valves and gate valves fitted, pipework altered and reconnected
  • Tank cleaned and flushed, with a SINGLAS laboratory water sample test completed

Our Approach

1. Looking at What the Tank Was Actually Doing

Before pricing a replacement we looked at what the factory draws rather than simply matching the existing tank. The existing tank held considerably more than the process required, which is common on older installations where the storage was sized generously at the outset and never revisited.

2. Right-Sizing the Replacement

We proposed a tank at half the footprint – same length, same height, half the width – matched to the factory’s actual usage. The client agreed, and the smaller tank was the one installed.

3. Fitting the New Tank to the Existing Plinth

A smaller tank does not automatically sit on a foundation built for a larger one. We planned the new tank’s dimensions and skid base around the existing reinforced concrete plinth so it could be reused as it stood, avoiding concrete work and the delay that comes with it.

4. Bypass to Keep the Factory Running

A temporary bypass was installed before the old tank came out, so the factory kept its water supply through the dismantling and rebuild rather than losing it for the duration of the works.

5. Valves, Flushing and Water Testing

New ball float valves and gate valves were fitted and the pipework altered and reconnected. The new tank was cleaned and flushed internally, and a water sample was sent for testing at a SINGLAS accredited laboratory in line with PUB requirements before handover.

 

Why This Matters

An oversized water tank is a quiet problem. It does not fail, it does not leak, and nothing on site draws attention to it – so it usually stays oversized for as long as the building stands. But water that sits in storage longer than it needs to is water turning over more slowly, and a tank holding far more than the process draws is carrying volume the site never asked for. It also costs more to clean, more to maintain, and puts more load on the structure underneath it than the job requires.

A full replacement is the one moment when that is worth revisiting. The useful question is not what size the existing tank is, but what the site actually uses – and those two answers are often some way apart, particularly on older installations where the storage was sized generously at the start and never looked at again.

The constraint is usually the foundation. A plinth built for a large tank does not automatically suit a smaller one, and if that is not planned for, right-sizing turns into concrete work. Designing the new tank and its skid base around the existing plinth is what keeps the saving a saving.

With over 35 years of experience and more than 4,000 water tanks installed across Asia, Magtech continues to deliver FRP water tank replacement for industrial and commercial sites across Singapore.

35+

Years of experience

in sectional water tanks

4,000+

Tanks installed

across Singapore and Asia

Our team will respond within 24–48 hours.

◉ NEED A FASTER RESPONSE? WhatsApp Our Team →
PROJECT GALLERY

Replacement Photos

DISCUSS YOUR PROJECT

Enquire About 2 Second Chin Bee Road Tank Installation, Replacement or repair

Send us the required effective capacity, available space, intended water use and project drawings. Our team can review the information and advise on the next step.