Tengah HDB Development

Project: Tengah HDB Development

FRP Water Tank Installation at Tengah HDB, Singapore feature

Magtech General Construction & Trading Pte Ltd has been actively involved in the supply and installation of Fibreglass Reinforced Plastic (FRP) water tanks for the Tengah HDB Development, Singapore since 2022. This ongoing project forms part of the Centralised Cooling System (CCS), supporting one of Singapore’s key sustainable housing initiatives.

To date, the project comprises a total of 121 FRP tanks of various sizes and configurations that is still ongoing, including:

Tank Size / SpecificationQuantity
(1+2)m x 3m x 3m (H)11 units
2m x 1m x 1m (H), Insulated11 units
1m x 1m x 1m (H), Insulated14 units
(2+2)m x 2m x 3m (H)14 units
(2+2)m x 2m x 2.5m (H) c/w 1m x 1m x 0.5m (H) top sump26 units
(2+1)m x 3m x 2.5m (H)3 units
1m x 1m x 1m (H), Insulated24 units
(2+2)m x 2m x 3m (H)18 units

As part of a large-scale and long-term development, this project required consistent coordination, scheduling, and delivery across multiple phases. The tanks were designed to support the CCS infrastructure, where reliability, durability, and performance are critical for long-term operation.

Our scope of work includes the supply and full installation of FRP sectional panel tanks, covering base structures, panels, roof systems, internal reinforcements, insulation (where required), and all necessary accessories. Each installation is carried out in accordance with project specifications, ensuring compliance with relevant standards and performance requirements.

Given the scale and duration of the project, maintaining consistency in quality and workmanship across all installations has been a key focus. Our experienced in-house installation team has been deployed throughout the project to ensure smooth execution, proper coordination with other trades, and timely completion of each phase.

This project stands as one of Magtech’s flagship long-term developments, demonstrating our capability to support large-scale infrastructure projects over extended periods. With over 35 years of experience and more than 4,000 water tanks installed across Asia, we are well-equipped to deliver reliable solutions for complex and multi-phase projects such as Tengah HDB’s CCS system.

Project Info

Get a Free Water Tank Consultation

Our team will get back to you within 24-48 hours

Other related projects

Project: Olympia City

Project: Norodom Business Centre

Project: Quartz Industrial Building