Client Notice

Pricing update from October 2026: Revised pricing will apply due to continued increases in material, manufacturing and logistics costs.
Dagupan Water District
New Built Project

Dagupan Water District

This project involved the supply and installation of a large-capacity FRP water tank system for the Dagupan Water District, Philippines, designed to support the water supply needs of the entire district.

Large-capacity FRP water tank system installation for Dagupan Water District, Philippines – end view of the completed sectional tank
End view of the completed sectional tank

PROJECT INFORMATION

PROJECT OVERVIEW

Key Challenges

The tank was designed with three compartments, requiring careful planning and coordination to ensure:

  • Structural integrity across multiple compartments
  • Proper load distribution and reinforcement
  • Efficient installation within project constraints

The scale and complexity of the tank tested both our technical and engineering capabilities, particularly in delivering a solution that met performance and durability requirements.

01
Our Solution

Our team provided a fully engineered solution, including:

  • Design and installation of an FRP sectional tank with external reinforcements
  • Optimisation of structural support to ensure stability at 5m height
  • Careful compartment configuration to meet operational and maintenance requirements

Working closely with the project stakeholders, we ensured that all specifications were met while maintaining quality and efficiency throughout the installation process.

02
Outcome

The completed system now serves as a reliable water storage solution for the Dagupan district, supporting continuous water supply for the surrounding community.

This project highlights Magtech’s ability to:

  • Deliver large-scale water tank systems
  • Handle complex multi-compartment designs
  • Provide engineering-driven solutions for critical infrastructure projects
35+

Years of experience

in sectional water tanks

4,000+

Tanks installed

across Singapore and Asia

Our team will respond within 24–48 hours.

NEED A FASTER RESPONSE? WhatsApp Our Team
PROJECT GALLERY

New Built Photos

DISCUSS YOUR PROJECT

Enquire About Dagupan Water District Tank Installation, Replacement or repair

Send us the required effective capacity, available space, intended water use and project drawings. Our team can review the information and advise on the next step.