Client Notice

Pricing update from October 2026: Revised pricing will apply due to continued increases in material, manufacturing and logistics costs.
Olympia City
New Built Project

Olympia City

Olympia City is one of the key mixed-use developments in Phnom Penh, Cambodia, comprising residential condominiums and a commercial shopping mall.

Magtech was engaged to supply and install two FRP water tank systems to support the domestic water requirements of the development, ensuring a reliable and efficient water storage solution for both residential and commercial usage.

FRP sectional water tank installation at Olympia City, Cambodia – close view of completed rooftop tank with access ladders
close view of completed rooftop tank with access ladders

PROJECT INFORMATION

PROJECT OVERVIEW

Project Scope & Challenges

As part of a large-scale urban development, the project required:

  • Reliable water storage to support high daily demand
  • Integration of tank systems within a multi-building development
  • Coordination with ongoing construction works on site

The dual-tank configuration was designed to ensure operational flexibility and consistent water supply across different usage requirements within the development.

01
Our Solution

Our team provided:

  • Supply and installation of two FRP sectional water tanks
  • Customised tank sizing and configuration to suit project requirements
  • Coordination with the main contractor to ensure smooth installation within the construction schedule

The modular FRP system allowed for efficient assembly on site while maintaining durability and long-term performance.

02
Project outcome

The completed water tank systems now support the domestic water supply for both the residential and commercial components of Olympia City.

This project demonstrates Magtech’s capability to:

  • Deliver solutions for large-scale mixed-use developments
  • Handle multi-tank configurations
  • Execute projects efficiently in overseas markets such as Cambodia
35+

Years of experience

in sectional water tanks

4,000+

Tanks installed

across Singapore and Asia

Our team will respond within 24–48 hours.

NEED A FASTER RESPONSE? WhatsApp Our Team
PROJECT GALLERY

New Built Photos

DISCUSS YOUR PROJECT

Enquire About Olympia City Tank Installation, Replacement or repair

Send us the required effective capacity, available space, intended water use and project drawings. Our team can review the information and advise on the next step.

Our team will respond within 24–48 hours.

NEED A FASTER RESPONSE? WhatsApp Our Team

Other related projects

Project: Meralodge

Project: Kim Tian Hotel

Project: Dagupan Water District