Client Notice

Pricing update from October 2026: Revised pricing will apply due to continued increases in material, manufacturing and logistics costs.
Samaky Tower
New Built Project

Samaky Tower

Magtech successfully completed the installation of a FRP sectional domestic water tank for Samaky Tower. The installed tank, measuring 3m x 3m x 1.5m (H), was designed to provide reliable domestic water storage for the development.

FRP sectional domestic water tank installation at Samaky Tower, Cambodia – side view of the completed tank
side view of the completed tank

PROJECT INFORMATION

PROJECT OVERVIEW

As the tank size was relatively compact, the installation process was straightforward and efficiently carried out by our experienced in-house installation team. Through proper coordination and planning, the complete installation works were successfully completed within a short span of 2 days while maintaining quality workmanship and installation standards.

Our scope of work included the assembly and installation of the FRP sectional water tank, including tank panels, internal reinforcements, roof structure, accessories, and all necessary fittings required for the domestic water storage system.

01
Scope of work
  • Check the supporting base, tank layout and available installation clearance
  • Supply and assemble the FRP/GRP sectional tank panels
  • Install the internal reinforcement system and roof structure
  • Fit the required flanges, accessories and access components
  • Check panel alignment and bolted connections during assembly
  • Complete final inspection and handover of the domestic water tank
02
Project outcome
  • One 3m x 3m x 1.5m (H) FRP/GRP domestic water tank completed
  • Full installation finished within two days
  • Compact sectional system fitted within the designated rooftop service area
  • Tank handed over with access and surrounding maintenance space retained

Why This Matters

For tower developments, a compact water tank still needs careful planning around structural supports, pipe locations and maintenance clearance. FRP/GRP sectional water tanks are assembled from individual panels, making them practical for service areas where moving a one-piece tank into position would be difficult.

This project demonstrates Magtech’s ability to deliver both small-scale and large-scale sectional water tank installations efficiently while maintaining reliability, quality, and professional workmanship across different project environments.

35+

Years of experience

in sectional water tanks

4,000+

Tanks installed

across Singapore and Asia

Our team will respond within 24–48 hours.

NEED A FASTER RESPONSE? WhatsApp Our Team
PROJECT GALLERY

New Built Photos

DISCUSS YOUR PROJECT

Enquire About Samaky Tower Tank Installation, Replacement or repair

Send us the required effective capacity, available space, intended water use and project drawings. Our team can review the information and advise on the next step.

Our team will respond within 24–48 hours.

NEED A FASTER RESPONSE? WhatsApp Our Team

Other related projects

Project: Olympia City

Project: Kim Tian Hotel

Project: National Bank of Cambodia