Client Notice
Pricing update from October 2026: Revised pricing will apply due to continued increases in material, manufacturing and logistics costs.
Client Notice
Magtech General Construction & Trading Pte Ltd supplied and installed a new FRP (GRP) sectional panel water tank at 7 Tuas South Street 10, an industrial building in Singapore. The tank stands at ground level in the yard beside the building, on a galvanised skid base set on concrete plinths.

The tank stores domestic water for the building and measures (1+1)m x 3m x 3m (H): two compartments separated by a partition, each with its own outlet. One side can be drained for cleaning or inspection while the other keeps supplying water. The panels are SUNNIK FRP to the SS 245 grade, with galvanised external stays and corner brackets.
A 3 m high tank needs safe access to its roof. Magtech fitted a 1 m high hot-dip galvanised guardrail along the roof perimeter of the tank, and the tank has caged access ladders, so the manholes can be reached for inspection and maintenance.
The (1+1)m layout means the building never loses all of its stored water during cleaning or inspection: one compartment is isolated while the other stays in service.
The yard stayed in use during the works. Sectional panels arrive in standard 1 m modules and are bolted together on the skid base, so the tank was assembled in place without heavy lifting.
The guardrail and caged ladders were installed with the tank, so roof access for maintenance is in place from day one rather than added later.
For an industrial building, a water tank that has to be fully drained for every inspection means downtime. A two-compartment sectional tank with safe roof access keeps maintenance simple and keeps water available while it happens.
With over 35 years of experience and more than 4,000 water tanks installed across Asia, Magtech continues to deliver FRP sectional water tank installation for industrial, commercial and residential buildings across Singapore.
in sectional water tanks
across Singapore and Asia




Send us the required effective capacity, available space, intended water use and project drawings. Our team can review the information and advise on the next step.