Project overview
Magtech General Construction & Trading Pte Ltd successfully completed the replacement of four (4) water tanks at Changi Logistics Centre, Singapore for CapitaLand in 2025. This project involved a combination of Fibreglass Reinforced Plastic (FRP) and Hot-Dipped Galvanized (HDG) sectional tanks, serving domestic, transfer, and hose-reel applications.
Tank Details & Replacement Requirements
The installed tanks comprised the following sizes: (1+1)m x 3m x 1m (H), 7m x 3m x 1m (H), (4+6)m x 5m x 1m (H), and (1+1)m x 1m x 1m (H). As a full replacement project within an operational facility, careful coordination and planning were required to ensure continuity of water supply throughout the works.
Key Challenge: Minimising Water Disruption
A key challenge for this project was the requirement to minimise water disruption, while complying with CapitaLand’s strict internal operational and safety policies. Due to the existing piping configuration and lack of direct replacement feasibility, our team proposed and implemented a temporary tank and bypass system to maintain continuous water supply during the replacement process.