ARC Changi T5
New Built Project

ARC Changi T5

Magtech General Construction & Trading Pte Ltd successfully completed the supply and installation of two (2) units of Hot-Dipped Galvanized (HDG) pressed steel water tanks for ARC Changi T5, Singapore.

Hot-dipped galvanized pressed steel water tanks at ARC Changi T5, Singapore – side view of completed twin HDG sectional tanks
Side view of completed twin HDG sectional tanks

PROJECT INFORMATION

PROJECT OVERVIEW

Completed in 2024, this project represents one of our key installations in recent years, supporting critical fire protection infrastructure for a major development.

Each tank measures 12m (L) x 9m (W) x 3m (H), providing large-capacity water storage to meet the operational demands of the sprinkler system. Due to the scale of the tanks and project requirements, careful planning and coordination were essential throughout the installation process.

A key challenge for this project was the strict timeline imposed, requiring efficient sequencing of works and close coordination on-site. Our team successfully managed the installation works and completed the project within the required timeframe, ensuring no delay to the overall construction schedule.

Our scope of work included the full assembly and installation of the sectional tanks, comprising the base structure, side panels, roof covers, internal tie-rod reinforcements, and all necessary fittings for integration with the fire protection system. Execution was carried out with a strong focus on safety, quality, and adherence to project requirements.

The HDG pressed steel tanks were designed and installed in accordance with SS22, ensuring compliance with Singapore standards for pressed steel sectional water tanks. The use of hot-dip galvanized panels provides excellent corrosion resistance and long-term durability, making them well-suited for fire protection applications in Singapore’s environment.

This project highlights Magtech’s capability in delivering large-scale water tank installations under tight project timelines. With over 35 years of experience and more than 4,000 water tanks installed across Asia, we continue to provide reliable and efficient solutions for major infrastructure and industrial developments.

01
Scope of work
  • Supply and installation of two HDG pressed steel sectional water tanks, each 12m (L) x 9m (W) x 3m (H)
  • Assembly of base structure, side panels and roof covers
  • Installation of internal tie-rod reinforcements
  • Supply and fitting of all accessories required for integration with the fire protection system
  • Sequencing of works to meet the project’s fixed completion date
  • Testing and handover for sprinkler system use
02
Project outcome
  • Two large-capacity sprinkler tanks delivered and installed to programme
  • Completed within the required timeframe with no delay to the overall construction schedule
  • Tanks built and installed in accordance with SS22
  • Fire protection water storage provided for a major infrastructure development

Why This Matters

On large infrastructure projects the tank is rarely the critical path on its own, but it sits between other trades that are. A tank that arrives late or takes too long to assemble holds up everything downstream of it, which is why sequencing and delivery reliability matter as much as the tank itself.

With over 35 years of experience and more than 4,000 water tanks installed across Asia, Magtech continues to deliver large-scale pressed steel water tank installation for infrastructure projects in Singapore.

35+

Years of experience

in sectional water tanks

4,000+

Tanks installed

across Singapore and Asia

Our team will respond within 24–48 hours.

NEED A FASTER RESPONSE? WhatsApp Our Team
PROJECT GALLERY

New Built Photos

DISCUSS YOUR PROJECT

Enquire About ARC Changi T5 Tank Installation, Replacement or repair

Send us the required effective capacity, available space, intended water use and project drawings. Our team can review the information and advise on the next step.

Our team will respond within 24–48 hours.

NEED A FASTER RESPONSE? WhatsApp Our Team

Other related projects

Project: AMA Building

Project: 18 Pandan Rd

Project: Changi Terminal 1