Client Notice

Pricing update from October 2026: Revised pricing will apply due to continued increases in material, manufacturing and logistics costs.
Royal Plaza Hotel
Replacement Project

Royal Plaza Hotel

Replacement works were completed at Royal Plaza Hotel, Singapore in 2024, involving the installation of two (2) units of Fibreglass Reinforced Plastic (FRP) sectional water tanks for domestic usage.

FRP Water Tank Replacement at Royal Plaza Hotel - side view of the completed FRP tank
side view of the completed FRP tank

PROJECT INFORMATION

PROJECT OVERVIEW

The installed tanks measure 11m x 6m x 3m (H) and (4+2)m x 4m x 3m (H), providing reliable water storage to support the hotel’s daily operations. As the works were carried out within an operational hospitality environment, careful planning and coordination were essential to ensure minimal disruption.

The project involved the dismantling of existing tanks and the installation of new FRP sectional panel tanks, including base structures, panels, roof components, internal reinforcements, and all necessary accessories. Works were sequenced efficiently to align with site requirements and operational constraints.

Given the nature of hotel operations, maintaining continuity of water supply was a key consideration. The replacement was carried out within the required timeline, with close coordination to ensure that disruption to building usage was kept to a minimum.

This project reflects Magtech’s experience in handling replacement works within operational environments such as hotels, where timing, coordination, and reliability are critical. With an experienced in-house installation team, we are able to deliver efficient solutions while maintaining quality and safety standards.

35+

Years of experience

in sectional water tanks

4,000+

Tanks installed

across Singapore and Asia

Our team will respond within 24–48 hours.

NEED A FASTER RESPONSE? WhatsApp Our Team
PROJECT GALLERY

Replacement Photos

DISCUSS YOUR PROJECT

Enquire About Royal Plaza Hotel Tank Installation, Replacement or repair

Send us the required effective capacity, available space, intended water use and project drawings. Our team can review the information and advise on the next step.

Our team will respond within 24–48 hours.

NEED A FASTER RESPONSE? WhatsApp Our Team

Other related projects

Project: New Futura

Project: Quartz Industrial Building

Project: 36 Fifth Avenue