Client Notice

Pricing update from October 2026: Revised pricing will apply due to continued increases in material, manufacturing and logistics costs.
Kim Tian Hotel
Replacement Project

Kim Tian Hotel

The replacement of an existing domestic water tank was carried out at Kim Tian Hotel, Singapore in 2025, involving the installation of a Fibreglass Reinforced Plastic (FRP/GRP) sectional tank.

FRP/GRP domestic water tank replacement at Kim Tian Hotel, Singapore – completed sectional tank with booster pumps and connected pipework
completed sectional tank with booster pumps and connected pipework

PROJECT INFORMATION

PROJECT OVERVIEW

The new tank, measuring (2+3)m x 3m x 3m (H), was installed to replace the existing system and improve overall reliability for the building’s domestic water usage. As with most replacement works within an operational building, careful coordination was required to ensure that the dismantling and installation process was carried out efficiently.

Works included the removal of the existing tank and the installation of the new FRP sectional panel tank, comprising the base structure, side panels, roof structure, internal reinforcements, and all necessary accessories. The installation was completed in accordance with project requirements, with attention to safety and site conditions.

FRP water tanks are commonly used for domestic applications due to their corrosion resistance and suitability for long-term use, particularly in replacement projects where structural weight and installation constraints are important considerations.

This project reflects Magtech’s consistent experience in handling standard replacement works across various building types, including hotels and residential developments. With an experienced in-house installation team, we are able to deliver such projects efficiently while maintaining quality and reliability.

35+

Years of experience

in sectional water tanks

4,000+

Tanks installed

across Singapore and Asia

Our team will respond within 24–48 hours.

NEED A FASTER RESPONSE? WhatsApp Our Team
PROJECT GALLERY

Replacement Photos

DISCUSS YOUR PROJECT

Enquire About Kim Tian Hotel Tank Installation, Replacement or repair

Send us the required effective capacity, available space, intended water use and project drawings. Our team can review the information and advise on the next step.

Our team will respond within 24–48 hours.

NEED A FASTER RESPONSE? WhatsApp Our Team

Other related projects

Project: 110C Sixth Avenue

Project: Olympia City

Project: Quartz Industrial Building